By the end of 2022, the campus will have been transformed to enable the responses which ESSEC wishes to offer in the face of shifting trends in teaching, research practices and urban planning conceptions for an International Campus-City.

To build toward this, four key strategic priorities were set out in the Campus 2020 project: redesigning campus traffic routes (pedestrianization, increased green spaces, opening onto the François-Mitterrand Park, creating multiple dynamic venues, etc.); creating a new Sports & Recreation Center; transforming the “historic” administrative tower into the Research Green Tower; and creating the Center for Creative Learning composed of new innovative teaching spaces.

Sports & Recreation Center

A set of modern and multi-purpose sports infrastructures

  • 2 floors of multi-purpose sports facilities in step with students’ needs (a 1,100-m² Omnisports Hall, a 120-m² climbing wall, 2 multi-sports halls spanning 200 m² each, and 2 rooftop tennis courts),
  • Occasionally made available for examinations, forums, etc.,
  • A transparent structure, overlooking the park and including access via the park to allow use by other members in the community.

Center for Creative Learning

Featuring digital learning equipment and spaces ready to be modulated based on the interactions with different companies

  • 2 floors of teaching spaces designed to meet the needs of the future (versatile, modular, multi-campus courses, incorporating digital teaching innovations, etc.)
  • on the ground floor: 700 m2 of WorkLab-type spaces to develop joint projects between companies/students/researchers
  • on the first floor: 900 m² of space dedicated to new teaching
  • open 24/7
  • The structure is designed to accommodate two additional floors, in order to meet new needs emerging over time.

Research Green Tower

Where cutting-edge research will be developed

  • A new facility fostering the emergence of rigorous and relevant, experimental and multidisciplinary academic research drawing upon flexible, agile and user-friendly spaces
  • Spaces dedicated to international research seminars, thesis rooms, new working spaces for professor-researchers and doctoral students, etc.,
  • eco-responsible and eco-sufficient

A GREEN AND ECO-RESPONSIBLE CAMPUS

  • A campus 100% for pedestrians
  • Green spaces and wooded areas
  • The campus landscape extends into the François-Mitterrand Park
  • Charging stations on-site for electric vehicles
  • Optimized use of roofs at the heart of the campus.

The main stages of the construction

SEPTEMBER 2017

ARCHITECTURAL COMPETITION LAUNCHED

SEPTEMBER 2018

WINNING PROJECT SELECTED BY JURY

END OF 2019

BUILDING PERMIT FILED

EARLY 2020

START OF WORK - SPORTS & RECREATION CENTER

MID-2020

START OF WORK - GREEN RESEARCH TOWER

MID-2020

START OF WORK - CENTER FOR CREATIVE LEARNING

Take part

Donate

Calendar

Have your say in the 2020 campus project!

This campus is our project to everyone, so do not hesitate to contribute and share!

You have an idea ? A suggestion ? Tell us everything, this space is yours. We will share the best ideas with the rest of the community on a regular basis.

And to inform you and share, it is there

A project that needs each of you.

The ESSEC Foundation and the School team up to conduct a fundraising campaign with alumni and companies to offer students, professors, researchers, companies and staff an experience that promotes the sharing of knowledge and knowledge. innovation, in an increasingly demanding international context.

Each donation is deductible of 66% of the income tax (IR), 75% of the IFI, or 60% of the IS if you give in the title of your company.

Make deductible donation

l'IR

l'IFI

l'IS

Amount
250€ 500€ 1000€ 3000€

Free :

My donation comes back to me X€ after tax deduction
250€ 500€ 1000€ 3000€

Free :

My donation comes back to me X€ after tax deduction
250€ 500€ 1000€ 3000€

Free :

My donation comes back to me X€ after tax deduction
Lu Ma Me Je Ve Sa Di
01 02 03 04 05 06 07
08 09 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31